So now that we went through everything we are waiting to have the Solar Panels installed. We have a WELCOME meeting that starts tomorrow 3 September 2020 and during that meeting I have questions I want to ask. I have not posted them here yet because I do not know all the questions I want to ask yet.
But whatever I learn I will post.
For now this is what I know.
Step 1. Buy the Solar Panels (CHECK)
Step 2. Have a Welcome Meeting
Step 3. Have a Technical Engineer come out and inspect and look at the property to ensure the sales team provided or captured all the information.
Step 4. Approve the final Technical Installation plan.
Step 5. Submit for Permitting
Step 6. Wait for Install (They said takes a Day)
Step 7. After install the Engineer will come out and determine it is ready for Power.
Step 8. DUKE will come out and do final inspection and switch over.
Step 9. Switch over Complete and you are generating your own power.